|

Clean Coal Power Initiative (CCPI) - Round 1
Environmental Control Devices - Multi-Pollutant Control Technologies
Demonstration of Integrated Optimization Software at the Baldwin Energy Complex - Project Brief [PDF-41KB]
NeuCo, Inc., Baldwin, Illinois
PROJECT FACT SHEET
PROGRAM PUBLICATIONS
- Final Report
- CCPI Reports: Project Performance Summaries, Post-Project Assessments, & Topical Reports
- Interim Reports
PAPERS AND PRESENTATIONS
- Naberhaus, Joe and Spinney, Peter, "An Integrated Approach to Boiler Optimization," [PDF-2.6MB], Reinhold NOx Roundtable and Expo, (February 2007)
- Short, Randy and James, Rob, "A Global Approach to Soot Cleaning Optimization at Dynegy's Baldwin Energy Complex," [PDF-1.7MB], EPRI Heat Rate Improvement Conference (January 2007)
- Naberhaus, Joe, “Maximizing Operating Effectiveness with Integrated Combustion and Sootblowing Optimization” [PDF-2.4MB], Power-Gen International, Orlando, FL (November 2006)
- Kirk, Peter, James, John and Naberhaus, Joe, “Implementation Results for Integrated Optimization at Dynegy’s Baldwin Energy Complex” [PDF-75KB], 30th International Technical Conference on Coal Utilization and Fuel Systems, Clearwater, FL (April 5, 2006)
- Wicker, Ken, “CCPI Bears First Fruit” [PDF-580KB], Power (January/February 2006)
- Spinney, Peter, “Substantial Progress Shown in Clean Coal Initiative Results” [PDF-100KB], Power Engineering (January 2005)
|